0

Air permits for natural gas engines

A complete permit application for an oil & gas facility must include all applicable elements on Form APCD-100.

 

Reciprocating Internal Combustion Engine APEN (Form APCD-201)
 

Use an APEN to apply for a new permit; request a modification to an existing permit; complete a routine (five-year) renewal for an existing permitted source or report changes in emissions, production or equipment.

Alternate Operating Scenario (AOS)

Report a permanent engine replacement for your RICE.


General Permit

General Permits offer a streamlined approach to air emissions permitting. GP02 is only available for oil & gas industry sources. Review the general permit GP02 to determine if your engine meets the applicability requirements. 

GP02: Natural Gas Fired Reciprocating Internal Combustion Engine

  • PS Memo 11-03
    Permitting Guidance for Natural Gas Fired RICE GP02.​

Operating and Maintenance Plan for natural gas-fired RICE at an oil & gas facility (Form APCD-301)

An O&M plan is required for all process units with emission controls at a synthetic minor or major stationary source. Visit the Oil and gas Operating & Maintenance Plan forms page for guidance and more information.


Calculate your natural gas engine emissions

This link will download the Emission Calculation & Regulatory Analysis Workbook.


Guidance for natural gas engine permits