Air permits for amine sweetening units

For a complete permit application, you must include all applicable elements on Form APCD-100.

Amine Sweetening Unit APEN (Form APCD-206)  |  Guidance
 

Use an APEN to apply for a new permit; request a modification to an existing permit; complete a routine (five-year) renewal for an existing permitted source or report changes in emissions, production or equipment.

Operating and Maintenance Plan for amine sweetening units (Form APCD-306)

An O&M plan is required for all process units with emission controls at a synthetic minor or major stationary source. Visit the Oil and gas Operating & Maintenance Plan forms page for guidance and more information.

Alternative emissions control device request form

The division will consider, on a case-by-case basis, alternative emissions control equipment to meet control requirements of Regulation No. 7. The operator must obtain approval to use the alternative emissions control equipment prior to use.

  • PS Memo 15-03 - Air pollution control equipment requirements of Regulation No 7, Part D, Section II.

Guidance for amine sweetening unit permits

Step-by-step: Reporting your air emissions and applying for air permits.