For a complete permit application, you must include all applicable elements on Form APCD-100.
Amine Sweetening Unit APEN (Form APCD-206) | Guidance
Use an APEN to apply for a new permit; request a modification to an existing permit; complete a routine (five-year) renewal for an existing permitted source or report changes in emissions, production or equipment.
Operating and Maintenance Plan for amine sweetening units (Form APCD-306)
An O&M plan is required for all process units with emission controls at a synthetic minor or major stationary source. Visit the Oil and gas Operating & Maintenance Plan forms page for guidance and more information.
Alternative emissions control device request form
The division will consider, on a case-by-case basis, alternative emissions control equipment to meet control requirements of Regulation No. 7. The operator must obtain approval to use the alternative emissions control equipment prior to use.
-
PS Memo 15-03 - Air pollution control equipment requirements of Regulation No 7, Part D, Section II.
Guidance for amine sweetening unit permits
Step-by-step: Reporting your air emissions and applying for air permits.